The Department of Public Works released a list of
projects for construction in 2006. This list
identifies projects that are currently in
construction or are planned to begin
construction in 2006. Clark County Public Works
also participates with other agencies on a
number of other projects such as sound walls on
I-515 and Blue Diamond roadway improvements,
which are not listed below. During the 2006
year, the project list will be updated to
reflect projects under construction, completed,
or changed. Go to the Clark County Public Works
web pages located at www.accessclarkcounty.com/pubworks
and click on "2006 Project List" for
the monthly updated information.
|
ARTERIAL PROJECTS |
Description |
District |
|
Bermuda Rd./Silverado to Warm Springs
(Contract 5936-04) |
Widen to four lanes with full
improvements (curb, gutter and
streetlights) plus traffic signal |
A |
|
Cimarron Road / Craig to Red Coach (SID
148 Unit 2) |
Widen road with center turn lane and
curb and gutter, drainage facilities, and
miscellaneous work (part of the Craig Road
project) |
C |
|
Concrete Sidewalk Ramps 2005 (Contract
6069-05) |
Creation or modification of ADA
compliant sidewalk ramps |
various |
|
Craig Road / Durango to Buffalo (SID
148 Unit 1) |
Widen road to four lanes with center
turn lane and curb and gutter, traffic
control devices, drainage facilities and
misc. |
C |
|
Decatur Bl. / Warm Springs to Beltway |
Six-lane roadway with grade separation
at UPRR |
A,G |
|
Durango Dr./Windmill to Beltway
(Contract 5959-05) |
Half-street improvements from Windmill
to Warm Springs. Full roadway improvements
with SID 144A from Warm Springs to the
Beltway. Also included are traffic signal
underground lines and storm drains. |
A,F |
|
Durango/Windmill to Hacienda (Phase
III-Beltway to Hacienda) |
Six-lane road in 100-ft. right-of-way,
left-hand turn pockets at major crossings,
and drainage improvements |
A,F |
|
Hacienda Road / UPRR Separation
(Contract 5892-04) |
Arterial connector will extend Hacienda
from Arville to Valley View with four-lane
grade separation at UPRR. Traffic signals
at Arville and Hacienda are included. |
G |
|
Industrial Rd. / Warm Springs to
Oquendo |
Four-lane fully improved roadway |
A,G |
|
Lower Duck Creek Detention Basin
Offsites |
Roadway improvements on Richmar from
Gillespie to Bermuda including pavement on
the half-street, and curb and gutter |
A |
|
Nellis Blvd / Hacienda to Russell
(Contract 5464-03) |
Four-lane extension of Nellis Boulevard
from Hacienda Ave. to Russell Road; a
bridge at Duck Creek and I-515; and a
traffic signal at Russell & Nellis. |
G |
|
Paradise/Harmon to Desert Inn (Phase
II-Naples to Harmon) |
Extension of the Paradise/Swenson
one-way couplet north to Harmon Avenue.
Widen Harmon Ave. between Paradise and
Swenson; modify signals at Harmon/Paradise
and Harmon/Swenson; and add a new traffic
signal at Paradise/Naples. |
E |
|
Rainbow Bl. / Blue Diamond to Beltway
(Phase 2 - Blue Diamond to Windmill) |
Four travel lanes, two on each side of
the street. Underground facilities for
future traffic signals are to be installed
at Pebble Road and Wigwam Avenue. A
traffic signal may be installed at
Windmill Lane. Raised medians, a storm
drain and culvert system will also be
installed. |
A |
|
Russell Road / Beltway to Rainbow Bl. |
Four-lane roadway with full
improvements and the potential to restripe
roadway, with future needs, to six-lanes.
Includes traffic signals at Durango Drive,
and underground facilities for future
signals will be installed at Buffalo
Drive, Tenaya Way, and Timber Creek
Street. Also includes storm drain and
flood water conveyance facilities. |
A,F |
|
Russell Road / Rainbow to Decatur
(Contract 5978-05) |
Four-lane roadway with full
improvements. Also includes traffic signal
systems at Durango & Lone Mountain
Road, Maryland & Pyle, Sahara &
Tree Line, Spring Mountain & Tenaya |
G |
|
Russell Road / Boulder Hwy to Broadbent
Bl. |
Reconstruction and realignment to a six
lane road in 100-ft. right-of-way,
left-hand turn pockets at major crossings,
and drainage improvements |
G |
|
Silverado Ranch Bl. / Jones Bl. to Dean
Martin Dr. |
Six-lane roadway with full improvements |
A |
|
Stephanie / Missouri Alignment |
Reconstruction of offsite improvements
and half-street construction on the east
side of street |
G |
|
Stephanie / Russell Realignment |
Four-lane roadway including a traffic
signal modification at Stephanie &
Russell |
G |
|
Tropicana Detention Basin Offsite
Improvements |
Half-street improvements, curb, gutter
and sidewalk on Oquendo Ave. from Decatur
to Arville |
G |
|
10 Traffic
Capacity Improvements Phase 2 - 2005
(Contract 6279-05) |
Includes traffic signal systems at 7
intersections (Flamingo & Hualapai, El
Capitan & Spring Mountain Rd, Cimarron
and Spring Mountain, Hacienda & Torrey
Pines, Hacienda & Lindell, Las Vegas
Bl & LeBaron, Count Diero &
Hualapai); school flashers at 3 locations
(Lindell & Oakey, Torrey Pines &
Viking, Redwood & Twain); and the
extension 2 left-turn lanes at Desert Inn
& Valley View and at Flamingo and
Rainbow |
A,C,F,G |
|
RESORT CORRIDOR PROJECTS |
Description |
District |
|
Harmon Ave. Relocation at Las Vegas Bl.
(Contract 6206-05) |
Six-lane roadway and realignment of the
Harmon Ave. and Las Vegas Bl. intersection |
G |
|
Las Vegas Blvd. Median Synthetic Turf
Installation (Contract 6195-05) |
Removal of natural grass and
irrigations systems and replacement with
artificial turf |
E,G |
|
Pedestrian Grade Separation at Las
Vegas Bl. and Spring Mountain Road
(Contract 5445-03) |
Three spans of above-grade pedestrian
crossings |
E |
|
BELTWAY / HIGHWAY
PROJECTS |
Description |
District |
|
Beltway (Northern): Traffic Signals at
Losee Road, Pecos Road, and Lamb Bl.
(Contract 5998=05) |
Add traffic signals at Losee Road,
Pecos Rd. and Lamb Bl., with additional
lanes at intersections and minor drainage
improvements. |
B |
|
Beltway (Northwestern): Lone Mountain
repairs (Contract 6304-05 |
Investigation and repair of asphalt and
construction of drainage facilities in the
Lone Mountain area. |
C |
|
Beltway Improvements (215/US95 Signage) |
Enhancements of signage at US95 at the
Beltway, arterial and miscellaneous
signage, also will provide signage along
the Northern Beltway |
B, C |
|
Beltway (Summerlin area): Summerlin
Parkway to Craig Road |
Beltway conversion from partial freeway
facility to full-freeway facility. Add one
lane in each direction, auxiliary lanes,
bridge structure at Cheyenne, drainage
improvements and soundwalls in select
locations |
C |
|
Beltway (Southeastern area): Pecos to
Stephanie Upgrades (Contract 6220-05) |
Add additional lane in each direction
between Pecos to Stephanie, add auxiliary
lanes between interchanges |
A,G |
|
Beltway (Southwest area): Sunset to
Buffalo (Contract 5764-04)
|
Four lanes of full freeway facility,
and bridges, interchanges and approaches
at Durango and Sunset |
A,F |
|
Beltway (Southwest area): Sunset to
Hualapai (Contract 5872-04) |
Four lanes of full freeway facility,
including full interchanges at Russell and
Tropicana |
F |
|
Silverado Road / I-15 Interchange |
Interchange at I-15 and six-lane
roadway in 100-foot right-of-way from Las
Vegas Bl. to Dean Martin Drive |
A |
|
FLOOD CONTROL PROJECTS |
Description |
District |
|
Duck Creek/Lower Detention Basin to
I-15 (Phase II-Silverado to I-15) |
Concrete box channel with crossings at
Las Vegas Bl., Pyle Ave., and LeBaron.
Also includes a channel along Joe Rae to
meet with Duck Creek west of Giles |
A |
|
Duck Creek - El Dorado to Spencer |
60' wide rectangular channel with a box
culvert at El Dorado; reconstruction of
the Spencer box culvert; reconstruct
channel from Robindale to Spencer; and
provide local drainage. |
A |
|
Duck Creek Channel - Las Vegas Blvd. to
Silverado Ranch Blvd. |
Concrete channel improvements from Las
Vegas Blvd to Silverado Ranch Blvd with
crossings at Las Vegas Blvd and Pyle Ave.
Also includes channel improvements along
Joe Rae to meet with Duck Creek west of
Giles St. |
A |
|
Duck Creek / Mountain Vista to Green
Valley Parkway |
Channel Improvements |
G |
|
Duck Creek Railroad Detention Basin |
Facilities including a detention basin,
probable maximum flood spillway and other
related drainage structures |
F |
|
Flamingo Wash / Mojave to I-515 Phase
III (Contract 5326-03) |
Channel improvements, pedestrian bridge
structure, and maintenance access |
E |
|
Fort Apache Rd. Storm Drain / F1 to
Hacienda |
Storm drain system from Hacienda to
Russell Road |
F |
|
Harris Ave. Drainage Improvements
(Contract 6310-05) |
Drainage system to connect with
existing system at Nellis, including 800
feet of concrete 36-inch pipe between
Nellis and Ring Lane and one drop inlet |
G |
|
Lower Blue Diamond Detention Basin and
Outfall |
Detention basin with the capacity
(445.8 acre-ft with a 25.5 ft depth) to
handle a 100-year peak storm and outfall
facilities including 2,150 feet of
54" reinforced concrete pipe |
A |
|
Red Coach Ave. & Cimarron Road
Local Drainage |
Half-mile long storm drain system in
Red Coach Avenue from Cimarron Road to
Buffalo Road. Work includes trench
excavation and backfill, pipes, manholes,
drop inlets, permanent asphalt patch,
utility adjustment, removal/modification
of obsolete drainage facilities and other
related items of work (part of Craig Road
arterial project) |
C |
|
Sloan Channel/Charleston to Las Vegas
Wash (Contract 5524-04) |
Line flood channel with concrete |
E |
|
Tropicana North Branch Detention Basin |
Detention basin, outlet structure and
probable maximum flood spillway. Also
included are channel improvements from
Arville St to Schirlls St. |
G |
|
OUTLYING PROJECTS |
Description |
District |
|
Bunkerville/Windmill Wash Outfall |
Construct about 1-mile of underground
outfall facility from Riverside Rd (US Hwy
91) to Virgin River.
Work includes clearing and grubbing,
trench excavation and backfill, grading,
pipes, boxes, manholes, drop inlets,
retaining walls, pipe inlet/outlet aprons
and headwalls, riprap, railing, fence and
gate, irrigation overflow structure, pond
spillway, permanent asphalt patch, utility
adjustment and other related items of work |
A |
|
Gubler Bridge |
Bridge and crossing of Muddy River in
Overton |
B |
|
Needles Highway/ CalNev Border to 5
miles north (Contract 6006-05) |
Road improvements, traffic control and
drainage improvements |
A |
|
MAINTENANCE PROJECTS |
Description |
District |
|
Flamingo Wash @ Nellis Bridge
Maintenance (Contract 6285-05) |
Maintenance at channel under bridge |
E |
|
Flamingo Road/Las Vegas Blvd.
Pedestrian Bridge Mechanical Maintenance
(Contract 5598-04) |
Mechanical maintenance of pedestrian
bridges and facilities |
E,G |
|
Flood Control Maintenance Repairs
(Contract 5404-03) |
Misc. maintenance of flood control
facilities in Las Vegas Valley |
various |
|
Landscape Maintenance - Beltway Annual
(Contract 5720-04) |
Landscape and ground maintenance
services in right-of-way |
various |
|
Landscape Maintenance - Boulder Strip
(Contract 6124-05) |
Maintenance of landscape on Boulder Hwy
from I-515 to Tropicana Bl. |
E,G |
|
Landscape Maintenance - Las Vegas Blvd.
(Contract 5589-04) |
Landscape maintenance of 4 miles of
medians and maintenance of pedestrian
bridges |
E,G |
|
Landscape Maintenance - Misc. Area
(Contract 6292-05) |
Landscape maintenance of various public
right-of-way medians, entrance areas and
DI Detention Basin |
various |
|
Pulverize and Pave - 2005 (Contract
6245-05) |
Grinding and recycle of existing
pavement and surface with new layer of
asphalt paving |
various |
|
Slurry Seal - 2005 (Contract 6068-05) |
Application of asphalt emulsion and
sand to preserve pavement life |
various |
|
RECREATIONAL PROJECTS |
Description |
District |
|
Flamingo Wash Trail - Phase 1A
Stephanie to Hollywood |
Trail with two bridge crossings. Part
of the So. NV Public Lands Management Act
Program |
G |
|
Shooting Park - Phase 1 |
Recreational facilities including
public rifle, pistol, shotgun and archery
ranges in addition to a hunter education
center, park office, maintenance compound,
entrance, roadway and host area. |
B,C |
|
Wetlands Park Pedestrian Path
Reconstruction (6162-05) |
Approximately 650 feet of pedestrian
path adjacent to a pond within the Nature
Preserve Wetlands Park. |
G |
|
Wetlands Park Primary Trails Phase 1
(Contract 6294-05) |
One mile of scenic route of which 1/2
mile will be adjacent to future ponds. |
G |
|
Wetlands Park Primary Trails Phase 2 |
1.4-miles of 2-way scenic route with an
additional 2 miles of detached trails
along the Las Vegas Wash. |
G |
|
Wetlands Sunrise Mt. Trailhead
(Contract 6118-05) |
Trailhead on a 19-acre site including a
restroom, picnic area, shade structures,
parking, trails, and equestrian facilities |
G |
|
Wetlands Park Nature Preserve, Phase 2
(Contract 6119-05) |
Park with maintenance building,
restrooms, parking lot, curb and gutter,
pavement, trails, shade shelters, ponds,
streams, landscaping, and other features |
G |
|